M E M O R A N D U M
To: Honorable Mayor and Town Council
From: Rafael G. Casals, Town Manager
Date: September 27, 2017
Re: Issuance of an Invitation to Bid (ITB): SW 100 Avenue Stormwater Retrofit Project.
REQUEST
title
A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE ISSUANCE OF AN INVITATION TO BID (ITB) FOR CONSTRUCTION SERVICES FOR THE SW 100 AVENUE STORMWATER RETROFIT PROJECT; AND PROVIDING FOR AN EFFECTIVE DATE.
body.
BACKGROUND AND ANALYSIS
On August 20, 2008, the Town adopted the Stormwater Master Plan via Resolution No. 08-50 for the purpose of identifying opportunities to protect surface water quality and reduce flooding within the Town. This Stormwater Master Plan is comprised of the following components:
* A review of existing stormwater and drainage data, reports, and plans available through SFWMD, Miami-Dade County, and Town sources
* A field inventory of existing drainage structures
* A drainage atlas including the type, size, and general location of drainage infrastructure elements
* Basin and Sub-basin delineations based on available survey data and other sources
* Hydrologic and hydraulic modeling analysis of the existing systems and their capacity to handle the 5-year/24-hour, 10-year/24-hour, 25-year/72-hour, 50-year/72-hour, and 100-year/72-hour storm events
* Identification and analysis of alternatives for improvements needed to alleviate deficiencies identified in the hydrologic and hydraulic modeling phase
* Development of an optional Capital Improvement Plan (CIP) to implement the identified improvements
On April 15, 2015, the Town approved Resolution No. 15-22 selecting Marlin Engineering, Inc. for design services for the SW 100 Avenue Stormwater Retrofit Project, located within the Point Royale Section 5 Sub-Basin. Marlin Engineering, Inc. has prepared Drainage, Roadway, Signing and Pavement Marking Plans.
The SW 100th Avenue Stormwater Retrofit Project, is located within t...
Click here for full text