File #: Item # 2019-210    Version: 1 Name:
Type: Resolution Status: Passed
File created: 10/10/2019 In control: Town Council
On agenda: 10/16/2019 Final action: 10/16/2019
Title: A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE TOWN MANAGER TO ISSUE A PURCHASE ORDER TO MARLIN ENGINEERING, INC. FOR DESIGN SERVICES FOR THE SAGA BAY 1.7 SUB-BASIN WATER QUALITY IMPROVEMENT PROJECT; AND PROVIDING FOR AN EFFECTIVE DATE.
Attachments: 1. Manager Memo-Issuance of PO Marlin SB 1.7 Sub-Basin Design Services, 2. Manager Memo-Attachment A-Saga Bay 1.7 Sub-Basin Project Map, 3. Manager Memo-Attachment B-Consultant Proposal, 4. Resolution- Issuance of PO Marlin SB 1.7 Sub-Basin Design Services, 5. Resolution-Exhibit A-Marlin Engineering Inc Fee Proposal



M E M O R A N D U M

To: Honorable Mayor and Town Council

From: Rafael G. Casals, ICMA-CM, CFM, Town Manager

Date: October 16, 2019

Re: Issuance of Purchase Order to Marlin Engineering, Inc. to provide Professional Design Services for the Saga Bay 1.7 Sub-Basin Water Quality Improvement Project.


REQUEST
title
A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE TOWN MANAGER TO ISSUE A PURCHASE ORDER TO MARLIN ENGINEERING, INC. FOR DESIGN SERVICES FOR THE SAGA BAY 1.7 SUB-BASIN WATER QUALITY IMPROVEMENT PROJECT; AND PROVIDING FOR AN EFFECTIVE DATE.
body.
BACKGROUND AND ANALYSIS

On August 20, 2008, the Town Council adopted Resolution No. 08-50 approving the Stormwater Master Plan for the purpose of identifying opportunities to protect surface water quality and reduce flooding within the Town. The Stormwater Master Plan studied seventeen (17) sub-basins and is comprised of the following components:

* A review of existing stormwater and drainage data, reports, and plans available through South Florida Water Management District (SFWMD), Miami-Dade County, and Town sources
* A field inventory of existing drainage structures
* A drainage atlas including the type, size, and general location of drainage infrastructure elements
* Basin and Sub-Basin delineations based on available survey data and other sources
* Hydrologic and hydraulic modeling analysis of the existing systems and their capacity to handle the 5-year/24-hour, 10-year/24-hour, 25-year/72-hour, 50-year/72-hour, and 100-year/72-hour storm events

* Identification and analysis of alternatives for improvements needed to alleviate deficiencies identified in the hydrologic and hydraulic modeling phase
* Development of an optional Capital Improvement Plan (CIP) to implement the identified improvements

On August 20, 2014, the Town adopted the 2010 Miami-Dade County Local Mitigation Strategy ("Local Mitigation Strategy") via Resolution No. 14-55 for the purpo...