Title: A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE TOWN MANAGER TO ISSUE A PURCHASE ORDER TO MARLIN ENGINEERING, INC. FOR PHASE I OF THE TOWN-WIDE TRAFFIC CALMING ALTERNATIVES STUDY; AND PROVIDING FOR AN EFFECTIVE DATE.
Sponsors: Peggy Bell
Attachments: 1. Manager Memo-Issuance of PO to Marlin Eng Inc, 2. Manager Memo-Attach A-Marlin Eng Proposal, 3. Resolution-Issuance of PO to Marlin Eng Inc, 4. Resolution Exhibit A-Marlin Engineering Proposal




M E M O R A N D U M

To: Honorable Mayor and Town Council

From: Rafael G. Casals, Town Manager

Date: May 18, 2016

Re: Issuance of PO to Marlin Engineering, Inc. for Town-Wide Traffic
Calming Alternatives Study

REQUESTTitle

A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE TOWN MANAGER TO ISSUE A PURCHASE ORDER TO MARLIN ENGINEERING, INC. FOR PHASE I OF THE TOWN-WIDE TRAFFIC CALMING ALTERNATIVES STUDY; AND PROVIDING FOR AN EFFECTIVE DATE.
Body
BACKGROUND AND ANALYSIS

The Town is interested in adopting a Town-wide Traffic Calming Alternatives Master Plan. The purpose and goal of which is to identify particular locations which present speeding/traffic volume problems, determine whether and where traffic calming measures are needed, and recommend the necessary traffic calming measures in order to reduce any identified speeding and/or traffic volume problems for each location of concern.

To maximize funding for the Town of Cutler Bay, the study will be broken up into two (2) phases, including:

Phase 1 - Traffic Calming Study to develop Town-wide Traffic Calming Alternatives Master Plan.

Phase 2 - Design of Final Construction Plans and Technical Specifications, including obtaining necessary permits from MDPWD. Post Design Services, including preparation of bid documents and construction inspection services will also be included.

The study, Phase I, shall reflect traffic calming measures in an effort to reduce or eliminate cut-thru traffic and speeding within the neighborhood. The Town of Cutler Bay will be divided into logical quadrants to maximize efficiency. Suggested traffic calming devices for which the traffic intrusion analysis will examine are listed, but not limited to: Speed humps and/or tables,

neckdowns, traffic circles, half closures, full closures, channelization, chicanes, chokers, lane narrowing, traffic medians, diverters, and raised intersections.

T...