File #: Item # 2016-043    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/4/2016 In control: Town Council
On agenda: 4/20/2016 Final action: 4/20/2016
Title: A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE TOWN MANAGER TO ISSUE A PURCHASE ORDER TO TLC ENGINEERING FOR ARCHITECTURE, INC. FOR PROFESSIONAL ENGINEERING AND DESIGN SERVICES; AND PROVIDING FOR AN EFFECTIVE DATE.
Attachments: 1. Manager Memo – Issuance of PO to TLC Engineering, 2. Manager Memo - Attachment A - TLC Eng Proposal, 3. Resolution - Issuance of PO to TLC Engineering, 4. Resolution - Exhibit A - TLC Eng Proposal

 

 

 

M E M O R A N D U M

 

To:                                          Honorable Mayor and Town Council

 

From:                                          Rafael G. Casals, Town Manager

 

Date:                                          April 20, 2016

 

Re:                      Issuance of a Purchase Order to TLC Engineering for Architecture, Inc., for   RFQ #15-12 “HVAC Equipment and Controls Replacement”

 

REQUEST

title

A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE TOWN MANAGER TO ISSUE A PURCHASE ORDER TO TLC ENGINEERING FOR ARCHITECTURE, INC. FOR PROFESSIONAL ENGINEERING AND DESIGN SERVICES; AND PROVIDING FOR AN EFFECTIVE DATE.

body.

BACKGROUND AND ANALYSIS

 

The Town Council adopted Resolution No. 16-09, authorizing the Town Manager to negotiate and execute a professional services agreement between the Town and TLC Engineering for Architecture, Inc. (“TLC”), for professional engineering and design services to replace an existing heating, ventilation & air conditioning (“HVAC”) equipment and controls with a new HVAC system for the Town Center Building located at 10720 Caribbean Boulevard.

 

Town staff has negotiated the proposed design and engineering services with TLC, which would include HVAC engineering and coordinating pre-design test and balance to confirm existing conditions prior to design, electrical engineering pertaining to power, electrical distribution, fire alarm, and raceways for other low voltage systems, structural engineering and commissioning. The total negotiated cost for these professional services is $115,685.00 (Attachment “A”).  Town staff and TLC will work closely to design the new HVAC system to meet LEED Gold standards/requirements, for our Town Center Building.

 

RECOMMENDATION

 

Town staff recommends that the attached Resolution be adopted, authorizing the Town Manager to issue a purchase order in an amount not to exceed $115,685.00, based on the same terms and conditions as stated in the professional services agreement.