Title: A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, ACCEPTING A FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GRANT AWARD; APPROVING AN AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE TOWN; PROVIDING FOR AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATE.
Attachments: 1. Manager Memo-Accepting FDEP Grant Award Saga Bay 1.7, 2. Manager Memo-Attach A-FDEP Grant Award Letter Saga Bay 1.7, 3. Manager Memo-Attach B-Saga Bay 1.7 Project Location, 4. Resolution-Accepting FDEP Grant Award Saga Bay 1.7, 5. Resolution-Exhibit A-FDEP Grant Agreement Saga Bay 1.7

 

 

 

M E M O R A N D U M

 

To:                                          Honorable Mayor and Town Council

 

From:                                          Rafael G. Casals, ICMA-CM, CFM, Town Manager

 

Date:                                          October 28, 2020

 

Re:                      Accepting Florida Department of Environmental Protection (FDEP)

                     Grant Award and Approval of Agreement #NS074

 

REQUEST

title

A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, ACCEPTING A FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GRANT AWARD; APPROVING AN AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE TOWN; PROVIDING FOR AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATE.

body

BACKGROUND AND ANALYSIS

 

Funding Source:                      Florida Department of Environmental Protection

Project Title:                       Saga Bay 1.7 Sub-basin Water Quality Improvement Project

Amount Awarded:                       $600,000.00              Match Required:  $355,539.00

 

The Florida Department of Environmental Protection’s (FDEP) State Water Quality Assistance Grant Program provides funding to local governments for projects that control water pollution from non-point sources and land use activities, including Stormwater Improvement Projects.

 

On April 29, 2020, the Town of Cutler Bay (the “Town) submitted a grant application requesting funding on behalf of the Public Works Department.  The Town proposes stormwater retrofitting in the 33.4-acre Saga Bay 1.7 Sub-Basin to improve drainage and water quality in the Saga Bay neighborhood. Drainage improvements will protect the impaired Black Creek Waterbody (WBID#3298) by constructing catch basins with sediment traps and pollution retardant baffles, installing approximately 260 LF of 18” Pipe, and 1,244 LF of French Drain. Although the grant does not require matching funds, the Town is responsible for any cost above the $600,000 grant award, and the Town estimates this match to be $355,539.00 based on engineering cost estimates. 

 

 

RECOMMENDATION

 

Town Staff recommends that the attached Resolution be adopted, accepting the grant from Florida Department of Environmental Protection (FDEP) for $600,000.00, approving the subsequent agreement (Agreement #NS074), and authorizing the Town Manger to execute the agreement for the aforementioned Saga Bay 1.7 Sub-basin drainage improvement project.

 

ATTACHMENT(S)

 

Ø                     Attachment “A” - FDEP Grant Award Letter for Saga Bay 1.7 Project

Ø                     Attachment “B” - Saga Bay 1.7 Project Location