Title: A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, SELECTING TLC ENGINEERING FOR ARCHITECTURE, INC. TO PROVIDE PROFESSIONAL SERVICES FOR HVAC EQUIPMENT AND CONTROLS (DESIGN, BIDDING, AND CONSTRUCTION MANAGEMENT SERVICES); AUTHORIZING THE TOWN MANAGER TO ENTER INTO A PROFESSIONAL SERVICES AGREEMENT; AND PROVIDING FOR AN EFFECTIVE DATE.
Attachments: 1. Manager Memo - Award of RFQ 15-12 HVAC Equipment and Controls, 2. Manager Memo - Attachment A - RFQ 15-12, 3. Manager Memo - Attachment B - Advertisement, 4. Manager Memo - Attachment C - Mandatory Pre-Bid Meeting, 5. Manager Memo - Attachment D - Submitted Proposals, 6. Manager Memo - Attachment E - Selection Committee Appointment, 7. Manager Memo - Attachment F - Selection Committee Evaluations, 8. Manager Memo - Attachment G - Selection Committee Recomendation, 9. Manager Memo - Attachment H - TLC Submittal Package, 10. Resolution - Award of RFQ 15-12 HVAC Equipment and Controls, 11. Resolution - Exhibit A - Agreement

 

 

 

M E M O R A N D U M

 

To:                                          Honorable Mayor and Town Council

 

From:                                          Rafael G. Casals, Town Manager

 

Date:                                          January 20, 2016

 

Re:                                           Award of Request for Qualifications (RFQ) #15-12:

HVAC Equipment and Controls (Design, Bidding and Construction Management Services)

 

REQUEST

title

A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, SELECTING TLC ENGINEERING FOR ARCHITECTURE,  INC. TO PROVIDE  PROFESSIONAL SERVICES FOR HVAC EQUIPMENT AND CONTROLS (DESIGN, BIDDING, AND CONSTRUCTION MANAGEMENT SERVICES); AUTHORIZING THE TOWN MANAGER TO ENTER INTO A PROFESSIONAL SERVICES AGREEMENT; AND PROVIDING FOR AN EFFECTIVE DATE.

body.

BACKGROUND AND ANALYSIS

 

The Town Council adopted Resolution #15-54, authorizing staff to issue a Request for Qualifications (RFQ #15-12), to identify the best available consultants to provide Professional Engineering Services to the Town. (Attachment “A”). The selected consultants will provide the Town professional engineering services in HVAC Equipment and Controls (Design, Bidding and Construction Management Services), as outlined in RFQ #15-12.

 

This RFQ was advertised on September 18, 2015 in the Daily Business Review, (Attachment “B”). A “Mandatory” pre-bid meeting was held on October 6, 2015, at Town Hall, Council Chambers. In attendance there were six (6) individuals representing five (5) potential bidders, (Attachment “C”). The RFQ was due on November 5, 2015, at which time; the Town received three (3) sealed proposals, (Attachment “D”).

 

A Selection Committee was established by the Town Manager, which included the Public Works Director, Planning & Zoning Director, and Stormwater Utility Manager (Attachment “E”).  Individual Committee members performed preliminary screening and reviewed each of the three (3) bid submittals.  The evaluation criteria for the selection committee were established by RFQ # 15-12.

 

Each Committee member awarded points in each scoring category, outlined in the RFQ. Based on the Committee’s short list rankings, two (2) firms were selected to perform Oral Presentations; December 3, 2015 at Town Hall.  Each of the selected short-list firms, were allowed thirty (30) minutes, to complete their firms Oral Presentations, before the Town’s Selection Committee.

 

After the Oral Presentations, the members of the Committee scored each firm’s presentation individually consistent with the requirements set forth in the RFQ.  Thereafter, the presentation and proposal scores were calculated to determine the ranked firm, (Attachment “F”).

 

The firm receiving the highest total ranking (presentation (25%) and proposal (75%) from the Committee was TLC Engineering for Architecture, Inc. (Attachment “G”).

 

The Selection Committee’s “final” rankings and total scores from the presentation is as follows:

 

FIRM                                                                                                                                                         COMBINED SCORE

 

TLC Engineering for Architecture, Inc.                                                                                    88.50

Wolfberg Alvarez & Partners                                                                                                         79.08                                                               

 

The selected firm’s submittal package is included as (Attachment “H”), for your review.

 

RECOMMENDATION

 

We recommend approval of the attached Resolution containing the Selection Committee’s recommendations and authorization for the Town Manager or his designee to negotiate a Professional Services Agreement (PSA) with TLC Engineering for Architecture, Inc.

 

ATTACHMENTS

 

Ø                     Attachment A - RFQ # 15-12 - HVAC Equipment and Controls

Ø                     Attachment B - Daily Business Review Advertisement

Ø                     Attachment C - Mandatory Pre-Bid Meeting Sign-in Sheet

Ø                     Attachment D - Submitted Proposals

Ø                     Attachment E - Selection Committee Appointment Memorandum

Ø                     Attachment F - Selection Committee Proposal Review and Short-Listing Memorandum

Ø                     Attachment G - Selection Committee’s Recommendation Memorandum

Ø                     Attachment H - TLC Engineering for Architecture, Inc. Bid Submittal