Title: A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, ACCEPTING A STANDARD GRANT AND AGREEMENT FROM THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION IN THE AMOUNT OF $200,000.00 FOR THE CUTLER RIDGE SECTION 3 RESURFACING AND DRAINAGE IMPROVEMENTS PROJECT; PROVIDING FOR AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATE.
Attachments: 1. Manager Memo-Accepting FDEP Grant Cutler Ridge Drainage Project, 2. Manager Memo-Attachment A-Legislative Funding Request, 3. Resolution- Accepting FDEP Grant Cutler Ridge Drainage Project, 4. Resolution-Exhibit A-FDEP Grant Agreement-Cutler Ridge Drainage Project

 

 

 

M E M O R A N D U M

 

To:                                          Honorable Mayor and Town Council

 

From:                                          Rafael G. Casals, ICMA-CM, CFM, Town Manager

 

Date:                                          November 20, 2019

 

Re:                     Acceptance of Florida Department of Environmental Protection

                     Grant Agreement - Cutler Ridge Section 3 Resurfacing and Drainage Improvements

 

 

REQUEST

title

A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, ACCEPTING A STANDARD GRANT AND AGREEMENT FROM THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION IN THE AMOUNT OF $200,000.00 FOR THE CUTLER RIDGE SECTION 3 RESURFACING AND DRAINAGE IMPROVEMENTS PROJECT; PROVIDING FOR AUTHORIZATION; AND PROVIDING FOR AN EFFECTIVE DATE.

body

 

BACKGROUND

 

During the 2019-20 State of Florida Legislative Session, Town staff and our Lobbyist worked closely to prepare a State Legislative Funding Request (Attachment “A”) for $300,000.00 to support the Cutler Ridge Section 3 Resurfacing and Drainage Improvements (the “Project”).  The Town Council’s full support of this project included, but was not limited to, traveling to Tallahassee to advocate on the Town’s behalf to secure the funding. The Town successfully secured $200,000.00 for the Project.

 

The Project is included in the Town’s adopted Flood Plain Mitigation Plan; which was approved by the Florida Department of Environmental Protection (FDEP) and the Federal Emergency Management Agency (FEMA).  This Project is also included in the Miami-Dade County Local Mitigation Strategy Plan and the Town’s adopted Stormwater Master Plan. The Town will implement Best Management Practices during the project to include installation of a 2,400 linear foot exfiltration trench (36" Diameter), and new catch basins. Following drainage installation, the identified streets will be paved, including pavement markings and signage. No residents will be displaced as a result these activities. 

 

 

 

The Town will fund Project costs above the $200,000.00 from a combination of Stormwater Utility Fees and Miami-Dade People’s Transportation Plan (PTP) Dollars.  

 

 

RECOMMENDATION

 

It is recommended that the Town Council approve the attached Resolution, accepting the grant from the Florida Department of Environmental Protection, approving the subsequent Agreement, and authorizing the Town Manager to execute the Agreement.

 

 

ATTACHMENT(S)

 

Ø                     Attachment “A” - State Legislative Funding Request