Legislation Details

File #: Item # 2015-004    Version: 1 Name:
Type: Resolution Status: Passed
File created: 12/30/2014 In control: Town Council
On agenda: 1/21/2015 Final action: 1/21/2015
Title: A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE ISSUANCE OF AN INVITATION TO BID (ITB) FOR SW 212th STREET DRAINAGE IMPROVEMENTS PROJECT; AND PROVIDING FOR AN EFFECTIVE DATE.
Attachments: 1. Managers Memo - Issuance of ITB 15-01 - SW 212 Street Drainage Improvements, 2. Resolution - Issuance of ITB 15-01 - SW 212 Street Drainage Improvements, 3. Resolution - Exhibit A - ITB 15-01 SW 212 Street Drainage Improvements



M E M O R A N D U M

To: Honorable Mayor and Town Council

From: Rafael G. Casals, Town Manager

Date: January 21, 2015

Re: Issuance of an Invitation to Bid (ITB): SW 212 Street Drainage Improvements Project (Cutler Bay Academy for Advanced Studies, Centennial Campus).


REQUESTTitle

A RESOLUTION OF THE MAYOR AND TOWN COUNCIL OF THE TOWN OF CUTLER BAY, FLORIDA, AUTHORIZING THE ISSUANCE OF AN INVITATION TO BID (ITB) FOR SW 212th STREET DRAINAGE IMPROVEMENTS PROJECT; AND PROVIDING FOR AN EFFECTIVE DATE.
Body
BACKGROUND AND ANALYSIS

The Town of Cutler Bay began the process of establishing a Stormwater Master Plan for the purpose of identifying opportunities to protect surface water quality and reduce flooding within the limits of the Town. The Town of Cutler Bay Stormwater Master Plan was adopted via Resolution No. 08-50. This Stormwater Master Plan includes the following components:

* A review of existing stormwater and drainage data, reports, and plans available through SFWMD, Miami-Dade County, and Town sources
* A field inventory of existing drainage structures
* A drainage atlas including the type, size, and general location of drainage
* infrastructure elements
* Basin and Sub-basin delineations based on available survey data and other sources
* Hydrologic and hydraulic modeling analysis of the existing systems and their capacity to handle the 5-year/24-hour, 10-year/24-hour, 25-year/72-hour, 50-year/72-hour, and 100-year/72-hour storm events
* Identification and analysis of alternatives for improvements needed to alleviate deficiencies identified in the hydrologic and hydraulic modeling phase
* Development of an optional Capital Improvement Plan (CIP) to implement the identified improvements

The Cutler Bay Academy of the Advanced Studies, Centennial Campus Drainage Improvement Project is located at 8601 SW 212 Street within the Saga Bay 10.1 Drainage Sub-basin. The project will consist of drainage improvements, exfi...

Click here for full text